Temperature will reach up to 36ºC and 37ºC in Abu Dhabi and Dubai, respectively
The DEWA said the projects aim to raise the total power output to 25 per cent, Xinhua news agency reported.
In order to realise the ambitious projects, DEWA has submitted proposals to international CSP consultants for advisory services for the first project of 200 megawatts to be completed by April 2021.
The project will be located in the Mohammed Bin Rashid Solar Park (MBR), the largest single-site solar power park in the world, according to the DEWA.
CSP, also called as solar thermal, generates power by using special mirrors to concentrate an area of sunlight onto a small area. The solar thermal energy can be transformed efficiently into electricity.
Saeed Mohammed Al-Tayer, the managing director and CEO of DEWA, said CSP can be stored easily, "which makes it possible to produce electricity after sunset."
The DEWA plan is in line with the directive by the His Highness Shaikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai to provide seven percent of Dubai total power output from clean energy sources by 2020, 25 percent by 2030 and 75 percent by 2050.
The entire MBR will produce 5,000 megawatts by 2030 and the project will cut about 6.5 million tonnes of carbon emissions annually.
Temperature will reach up to 36ºC and 37ºC in Abu Dhabi and Dubai, respectively
When the water could finally be cleared, almost half their stock of 20,000 books had been destroyed
Top seed Jannik Sinner brushes aside fellow-Italian Lorenzo Sonego, while sixth seed Stefanos Tsitsipas falls to Brazilian qualifier Thiago Monteiro
Rahul top scores for LSG but Samson and Jurel get RR home with their 121-run stand
Hosts win fifth and final international match in Lahore by nine runs
Sheffield United relegated after huge loss at Newcastle, In-form Everton assured of Premier League survival with narrow victory over Brentford
The three-strong flotilla had been due to sail on Friday from ports in Turkey with more than 5,000 tonnes of aid on board
The quake occurred at 8.29pm UAE time