The Green Spine, designed by URB in collaboration with EPIC Lab, promises to redefine urban mobility through 100 per cent solar-powered trams and eco-conscious infrastructure
kt network11 hours ago
The road closure will be in two phases, the first phase of which will be closing the road from midnight of Sunday till around 11am on Monday.
The second phase will include the closure of the areas located in front of the Emirates petrol station from 12 midnight on Monday till 10am on Tuesday.
The roadws will be temporarily closed till the completion of maintenance work on the heavily used road and till maintaining the decreasing level of road cement at the areas where maintenance work will be conducted.
Motorists are urged to comply with safety rules and to strictly follow the signboards placed on the road showing them directions to alternative routes till maintenance work is completed. People interested in suggesting and lodging complaints should directly call the hotline number 80086767.
The Green Spine, designed by URB in collaboration with EPIC Lab, promises to redefine urban mobility through 100 per cent solar-powered trams and eco-conscious infrastructure
kt network11 hours ago
The Israeli military said in a statement that it carried out a targeted strike
mena11 hours ago
The hosts were 81-3 at stumps in their second innings on day two in Chennai, as they extended their lead to 308
cricket12 hours ago
The competition will be a key highlight of the third edition of the 1 Billion Followers Summit, taking place from January 11 to 13, 2025
uae12 hours ago
The event featured insights from key speakers, including Yogacharya Dhakaram, Nilesh Ashar, and Ekansh Agrawal.
kt network12 hours ago
The first two Tests will be held back-to-back in Multan and the last in Rawalpindi
sports12 hours ago
They will remain on display at the museum until at least April 2025
arts12 hours ago